Environment Agency

Address: 
The Environment Agency
Bristol
BS1
United Kingdom

Partnership actions tagged by Environment Agency

Displaying 1 - 30 of 73
To restore the river to a more naturally functioning watercourse
Enhance river hydromorphology and biodiversity
Sub catchment Status
Scoping for and implementation of habitat improvements in Lower Teise to provide refuge for fish and increase longitudinal connectivity along the river. Teise Planned View
Work up designs, secure permissions and deliver improvement works that address the Reasons for Not Achieving Good status on the Water Framework Directive for this waterbody.  Upper Medway Active View
Work up designs, secure permissions and deliver habitat improvement works Teise Active View
Restoration of the River Darent through Central Park by weir removal, channel narrowing to recreate chalk stream habitats. Darent Active View
habitat restoration (in-channel, riparian, associated floodplain meadows) to help achieve Good Ecological Status in the River Darent Darent Proposed View
Investigate reasons for and options for removal of concrete amourment of channel below the M26 bridge Darent Proposed View
Delivery of river restoration on the Hammer Stream Beult Completed
To better understand in-river structures, their purpose and potential impacts
Sub catchment Status
Publish article describing how weirs affect fish communities. Completed
Prevent bank erosion and mitigate against potential flooding
Sub catchment Status
Prevent bank erosion adjacent to Love Lane allotments Cray and Shuttle Completed View
The river should support a mosaic of habitats with high biodiversity value
Protect and enhance the habitats of the river corridor & floodplain
Sub catchment Status
Deliver habitat enhancement to Hall Place reservoir Cray and Shuttle Completed View
Deliver habitat enhancements at Dartfordian Rugby Club Cray and Shuttle Proposed View
Deliver habitat enhancements at Foots Cray Meadows Cray and Shuttle Completed View
Investigate options for renaturalising the river at Hall Place and Gardens Cray and Shuttle Completed View
Improve condition and biodiversity of riparian areas
Sub catchment Status
Work up designs, secure permissions and deliver habitat improvement works Teise Active View
Identify locations for riparian habitat creation in partnership with landowners Beult Proposed
Eradicate and control Invasive non-native flora
Sub catchment Status
Delivery Invasive Non-Native Species (INNS) programme across the Medway catchment. Beult Active
Develop a network of volunteers to monitor Invasive Non-Native Species. Beult Proposed
To develop sustainable water management within the catchment
Develop an Ecosystems services model for improved aquifer recharge
Sub catchment Status
Investigate options for improved aquifer recharge Darent Proposed View
Reduce the impact of flooding
Sub catchment Status
Scope priority sub-catchments to implement NFM (Natural Flood Management) to manage flood risk more effectively throughout the catchment and build on the success of the Medway NFM project (2018-2021). Proposed
To improve water quality
Improve awareness and understanding of water quality
Sub catchment Status
Promote best practice farming approaches Middle Medway Proposed
Raise awareness of point source pollution from domestic and small scale sources Middle Medway Proposed
Tackling Diffuse Pollution
Sub catchment Status
Reedbed creation to mitigate surface run off entering the River Cray at Priory Ponds in Orpingon. Cray and Shuttle Completed View
Deliver silt trap and wetland treatment train in Dobb's Field to address sediment and nutrient loading of pond from upstream catchment, following South East Rivers Trust investigation and outline design report, to address the 'un-favourable' - no change state of this SSSI. Eden Active View
Tackling urban diffuse pollution
Sub catchment Status
Investigate mitigating water quality issues from motorway run-off Darent Proposed View
To have an appropriate self-sustaining fish population
Modify structures or install appropriate measures to allow eel passage
Sub catchment Status
Improve eel passage at Hawley gauging station Darent Proposed View
Protect fisheries and promote responsible angling
Sub catchment Status
Liaise with angling clubs to deliver fishing related training and guidance. Cray and Shuttle Active View
To have communities that enjoy, engage with and protect the river
Ensure the river is well-valued and understood by the local community
Sub catchment Status
Develop a citizen science project with the local community to provide intelligence on river issues. Darent Proposed View
Ensure stakeholders are aware and can contribute to the catchment improvement process
Sub catchment Status
Deliver annual surveying events with partner organisations Cray and Shuttle Active View
Sub catchment Status
Work with farming community to tackle diffuse pollution issues Darent Proposed View
Habitat restoration to help achieve Good Ecological Potential in the Hammer Stream Beult Completed View

Pages