Environment Agency

Address: 
The Environment Agency
Bristol
BS1
United Kingdom

Medway Partnership actions tagged by Environment Agency

Displaying 1 - 30 of 39
Sub catchment Status
Habitat restoration to help achieve Good Ecological Potential in the Hammer Stream Beult Completed View
Improve fish passage at Harpers Weir by removal of redundant structure Teise Completed
Habitat enhancement on the River Teise below Woodfall's weir to Medway confluence Teise
The river should support a mosaic of habitats with high biodiversity value
Eradicate and control Invasive non-native flora
Sub catchment Status
Delivery Invasive Non-Native Species (INNS) programme across the Medway catchment. Beult Active
Develop a network of volunteers to monitor Invasive Non-Native Species. Beult Proposed
Improve condition and biodiversity of riparian areas
Sub catchment Status
Identify locations for riparian habitat creation in partnership with landowners Beult Proposed
Work up designs, secure permissions and deliver habitat improvement works Teise Active View
To improve water quality
Tackling Diffuse Pollution
Sub catchment Status
Deliver silt trap and wetland treatment train in Dobb's Field to address sediment and nutrient loading of pond from upstream catchment, following South East Rivers Trust investigation and outline design report, to address the 'un-favourable' - no change state of this SSSI. Eden Active View
Improve awareness and understanding of water quality
Sub catchment Status
Promote best practice farming approaches Middle Medway Proposed
Raise awareness of point source pollution from domestic and small scale sources Middle Medway Proposed
To develop sustainable water management within the catchment
Reduce the impact of flooding
Sub catchment Status
Natural flood management at Bedgebury Pinetum to reduce flood risk downstream and offer additional benefits. Teise Completed View
Natural flood management at Sissinghurst to reduce flood risk downstream and offer additional benefits. Beult Completed View
Natural flood management at Pembury Woods to reduce flood risk downstream and offer additional benefits. Middle Medway Completed View
Natural flood management at Reeds Farm to reduce flood risk downstream and offer additional benefits. Middle Medway Completed View
Natural flood management at Capel to reduce flood risk at Capel and further downstream. Middle Medway Active View
Natural flood management at Birch Wood to reduce flood risk downstream and offer additional benefits. Beult Completed View
Natural flood management at Stonehall Farm to reduce flood risk downstream and offer additional benefits. Beult Completed View
Scope priority sub-catchments to implement NFM (Natural Flood Management) to manage flood risk more effectively throughout the catchment and build on the success of the Medway NFM project (2018-2021). Proposed
Develop a community flood warden network Eden Proposed
Promote local early warning flood systems Eden Proposed
To restore the river to a more naturally functioning watercourse
Enhance river hydromorphology and biodiversity
Sub catchment Status
Delivery of river restoration on the Hammer Stream Beult Completed
Add woody debris and berm deflector to increase flow diversity at Bayham L'Eglise. Teise Completed
Restore habitat at Harpers Weir Teise Completed
Adjustment to flow regimes from Bewl water Teise
Habitat restoration on the River Bewl Teise Completed
Work up designs, secure permissions and deliver improvement works that address the Reasons for Not Achieving Good status on the Water Framework Directive for this waterbody.  Upper Medway Active View
Investigate opportunities to de-culvert watercourses near Chiddingstone. Eden Planned
Investigate fish passage throughout Eden catchment Eden Active
To have an appropriate self-sustaining fish population
Address fish passage so fish can access appropriate habitats
Sub catchment Status
Improve fish passage within the Tudeley Brook sub-catchment Middle Medway Proposed
Investigate options for fish passage at Palace Avenue weir Middle Medway Proposed

Pages